Skins 2011 – Group Project. From our proposed individual projects (previous slide), one project was selected for construction. As a group, we developed a parametric model, conducted vigorous testing of units, laser- cut, assembled, and constructed the entire exhibit. The whole procedure was required to be documented, and structurally tested by external engineers and OH&S officers.